The one challenge with flat roofing is ensuring proper drainage.
Flat green roof drainage.
For a large roof it is recommended to have drains placed at multiple locations within the area of the roof.
The bottom edge lies flat against the roof to prevent rooftop penetration.
Secondary overflow drains are located at a higher point on the roof.
Grs drainage conduit is constructed from 80 recycled 16 gauge stainless steel.
Flow of water into them is promoted by positive drainage.
Zurn offers a variety of roof drain solutions suited for modular green roofs such as the z163 and the 84 options both shown below.
Modular green roofs are installed differently than layered green roofs requiring a different style of roof drain.
The build up of a flat green roof will vary depending upon the intended use.
Ponding water on flat roofs reduces the roof s lifespan.
A rooftop garden or additional outside living space are the top reasons people choose flat roofs.
Poor drainage can lead to serious issues with flat roofing from leaks to structural damage.
A standard roofing membrane and insulation layer is laid onto the underlying roof structure then a studded perforated drainage membrane such as oldroyd xv 20 greenxtra is used in addition to provide a drainage layer.
The most critical of these issues is the flat roof drainage systems.
For flat or nearly flat roofs primary drains are located at the lowest point of the roof.
Along with the benefits of a flat roof come unique challenges.
Increasing the angle of a flat roof will always increase the speed of water movement across the surface.
The need for flat roof drainage in order to prevent water accumulation and moisture damage flat roofs need to be equipped with special drainage systems.
If stone ballast is being utilized around the drain the 84 option shown above.
Please contact our technical department on 01403 210204 or submit an enquiry for more information.
The greenslope roof ponding repair kit provides a lightweight inexpensive solution to flat roof ponding.
Type of flat roof drainage each drainage low point roof sub area is allocated a roof drain and an overflow drain.
A green roof may require a separately plumbed secondary drainage system also known as the overflow relief system.
The channel is designed to be laid end to end and terminates either in the ballasted unplanted roof area or adjacent to the grs inspection chamber covered roof drain.
Your building and location can help determine which drain will fit your roof needs.